Start with the part and production requirements

  • Latest drawing and relevant CAD or reference files
  • Material grade and required finish
  • Order quantity and estimated annual demand for repeat production
  • Target delivery date
  • Critical dimensions, assembly requirements and intended application

How are drawing revisions handled?

A drawing revision may affect manufacturing methods, inspection requirements and delivery timing. Please provide the latest revision and notify us of changes so their impact can be reviewed before implementation.

Can inspection documents be included with the shipment?

Reports normally accompany the shipment. Electronic copies are available on request. If documents need approval before dispatch, please tell us in advance.

Is There a Minimum Order Quantity?

There is no minimum order quantity for CNC machining or sheet metal fabrication. We review requests for individual parts as well as production quantities. Unit pricing depends on the quantity and manufacturing requirements.

How Soon Will I Receive a Quotation?

We typically provide quotations within one business day (24 hours) for standard projects and two business days (48 hours) for more complex work. Weekends and public holidays are excluded. We will confirm receipt of your drawings and keep you informed if further clarification or evaluation is needed.

How Is Lead Time Calculated?

Quoted lead times are stated in calendar days, starting from receipt of your purchase order. Any drawing changes or outstanding information that affect the schedule will be discussed with you.

Does Finishing Affect Delivery?

Finishing and secondary operations may add time. The quoted lead time accounts for the specified processes and project requirements.

Can We Sign an NDA First?

Yes. Please contact our sales team before sending your drawings so we can arrange signing.

Can You Follow Our Documentation Requirements?

Please include your inspection instructions, report templates and any document approval requirements with your inquiry. We will review them with the quality team and confirm the arrangements during quotation.

Quality checklist for your RFQ

  • Latest drawing revision, including a ballooned drawing if required
  • Inspection plan and sampling requirements
  • Required reports and templates or formats
  • Tolerances and acceptance criteria
  • Any document approval required before shipment